Storrs & Regional Campuses: |
Project # | Phase | Approved | Budget | Actual Cost | Primary $ Source |
|---|---|---|---|---|---|---|
| 28 Professional Park Renovation | 201707 | Financially Closed | 6/28/17 | $675,000 | $604,832 | University Funds |
| Academic and Research Facilities – Homer Babbidge Library Level 1 Renovation | 201690 | Financially Closed | 4/26/17 | $3,920,000 | $3,595,899 | UCONN 2000; University Funds |
| Academic and Research Facilities – Homer Babbidge Library Level 4 Renovations, Heritage Floor | 201691 | Financially Closed | 4/26/17 | $1,150,000 | $921,222 | UCONN 2000; University Funds |
| Academic and Research Facilities – Main Accumulation Area for Regulated Wastes | 901807 | Financially Closed | 6/29/16 | $5,500,000 | $5,407,901 | UCONN 2000 |
| Advanced Technology Laboratory & White Building Elec. & Generator Modifications | 201598 | Cancelled | 9/24/14 | $605,000 | $26,223 | UCONN 2000, DM, Plant Funds |
| Agricultural Biotechnology & Advanced Technology Building Code Remediation Project | 201409 | Financially Closed | 12/4/07 | $964,307 | Plant Funds | |
| Agricultural Biotechnology Laboratory Phoenix Controls Upgrade | FO500077 | Financially Closed | 9/30/20 | $592,350 | $522,660 | University Funds |
| Aquatics Facility – Renovations to Atwater Pathobiology Building | 201441 | Financially Closed | 6/24/08 | $1,200,000 | $1,149,782 | Research Funds |
| Arjona and Monteith (new classroom buildings) | 901126 | Financially Closed | 9/27/12 | $95,000,000 | $89,268,259 | UCONN 2000 |
| Arjona and Monteith Renovations – Arjona Renovations | 901719 | Financially Closed | 12/12/12 | $15,400,000 | $14,963,142 | UCONN 2000 |
| Arjona and Monteith – Monteith Renovations | 901756 | Financially Closed | 9/29/16 | $24,000,000 | $23,700,924 | UCONN 2000 |
| Athletic Facilities Storrs LED Lighting Upgrade | FO500014 | Financially Closed | 5/2/18 | $1,377,772 | $1,186,275 | University Funds |
| Atwater Building – Roof Replacements | 901673 | Financially Closed | 9/27/12 | $600,000 | $567,799 | DM |
| Atwater Exterior Window Replacement | 901397 | Cancelled | 4/24/13 | $1,900,000 | $36,915 | DM |
| Atwater Lab Emergency Power Installation | FO500058 | Financially Closed | 6/29/22 | $682,700 | $674,851 | University Funds |
| Atwater Laboratory Electrical Service | 901633 | Financially Closed | 11/13/13 | $785,000 | $624,397 | DM |
| Atwater Pathobiology Fire Alarm Replacement | 901514 | Financially Closed | 6/23/09 | $510,000 | $348,359 | Plant Funds |
| Avery Point Academic Building Roof Replacement | 300098 |
Financially Closed | 8/1/18 |
$1,270,000 |
$996,826 |
University Funds |
| Avery Point Renovation – Utility Relocation and Buildings 21 & 23 Demolition | 901824 | Financially Closed | 4/29/15 | $7,300,000 | $7,197,914 | UCONN 2000 |
| Avery Point Campus Undergraduate & Library Building – Phase I | 901278 | Financially Closed | 4/25/12 | $9,315,150 | $9,190,863 | UCONN 2000 |
| Avery Point Campus Undergraduate & Library Building 58 Demolition | 901650 | Financially Closed | 9/28/11 | $570,000 | $454,426 | UCONN 2000 |
| Avery Point Campus Undergraduate & Library Building – Roof and Exterior Building Envelope Masonry Repairs | 901525 | Financially Closed | 8/4/09 | $573,000 | UCONN 2000 | |
| Babbidge Library Electrical Distribution System Upgrade | 901995 | Financially Closed | 4/29/17 | $4,000,000 | UCONN 2000; University Funds | |
| Babbidge IT & Phone Functional Areas – Heating & Air Conditioning and Electrical Repairs | 901580 | Financially Closed | 6/28/12 | $2,200,000 | $1,957,652 | DM & Departmental |
| Backfeed Loop – North Eagleville to Parking Garage to Storrs Road | 901416 | Cancelled | 12/12/12 | $300,000 | $222,254 | DM |
| (Werth Family) Basketball Champions Center | 201434 | Financially Closed | 2/25/15 | $35,535,800 | $35,483,332 | Departmental, Operating, Gifts |
| Beach Hall Lab Renovations | 300034 |
Financially Closed | 8/1/18 |
$6,000,000 |
UCONN 2000 | |
| Beach Hall Renovation of Rooms 245 & 246 | 901254 | Financially Closed | 9/22/09 | $970,000 | DM & Operating | |
| Beach Hall Renovations – Facade and Roof Repair | 901646 | Financially Closed | 8/8/12 | $2,500,000 | $2,267,695 | UCONN 2000 |
| Beach Hall Renovations – MCB Lab for New Faculty | 901773 | Financially Closed | 12/11/13 | $1,615,574 | $1,247,588 | UCONN 2000 |
| Beach Hall /Renovations – Phase I | 901273 | Financially Closed | 4/21/09 | $1,500,000 | UCONN 2000 | |
| Benton State Art Museum Addition | 901263 | Financially Closed | 9/21/10 | $1,350,000 | UCONN 2000 | |
| Benton State Art Museum Addition – Mechanical System Improvements | 901545 | Financially Closed | 9/21/10 | $2,150,000 | $1,643,528 | UCONN 2000 |
| Biobehavioral Complex Replacement (Renovation) | 901380 | Financially Closed | 11/10/11 | $3,000,000 | $2,589,140 | UCONN 2000 |
| Biobehavioral Complex Replacement – Science 4 Annex Reroofing | 901903 | Financially Closed | 8/5/15 | $1,000,000 | UCONN 2000 | |
| Bishop Center 1st Floor SFA Digital Media Renovation | 300006-TL2244 |
Financially Closed |
9/26/18 |
$523,000 |
UCONN 2000; University Funds |
|
| Bishop Renovation | 901387 | Cancelled | 4/13/11 | |||
| Bishop Renovation – Various Improvements for Academic & Student Services Activities | 901645, 901743 | Financially Closed | 9/13/12 | $2,425,000 | $2,216,499 | UCONN 2000 & Equipment |
| Budds Building Window Replacement | 901377 | Cancelled | 12/12/12 | $1,315,000 | $23,362 | DM |
| Burton Family Football Complex Locker Replacement | FO500042 | Financially Closed | 3/27/19 | $1,000,000 | Gift Funds | |
| Campus Wayfinding Improvements | 300118 |
Financially Closed | 2/24/21 |
$1,905,000 |
$1,904,297 | UCONN 2000 |
| Castleman Building Drainage | 901289 | Financially Closed | 9/28/11 | $550,000 | $506,131 | DM |
| Central Campus Parking | 300018 | Financially Closed | 2/21/18 | $2,250,000 | $1,878,962 | UCONN 2000; University Funds |
| Central Campus Infrastructure Upgrades | 902075 | Finacially Closed | 10/31/18 | $30,000,000 | UCONN 2000; Revenue Bonds : University Funds | |
| Central Utility Plant Emergency Generator System | 901197, 901194, 901195 | Financially Closed | 1/12/09 | $2,000,000 | DM | |
| Charter Oak Corrective Action Plan – Phase II | 201399 | Financially Closed | 9/26/06 | $860,000 | Plant Funds | |
| Charter Oak Suites Attic Sprinklers Installation | 201323 | Financially Closed | 11/14/06 | $1,000,000 | Plant Funds | |
| Chemistry Building Roof Snow Guards | FO500093 | Financially Closed | 9/30/20 | $916,000 | $730,275 | University Funds |
| CLAS Academic Service Center (ASC) Relocation to Rowe Building | 902108 | Financially Closed | 3/29/17 | $1,000,000 | $851,125 | UCONN 2000 |
| Code Remediation and Renovations – Ratcliffe Hicks Arena | 901352 | Financially Closed | 6/10/10 | $998,650 | $966,416 | DM & Departmental |
| Code Safety Inspections Summer 2007, corrective action | 901262 | Financially Closed | 9/25/07 | $2,200,000 | DM | |
| Community Professional Building Renovation – Avery Point Campus | 201543 | Financially Closed | 8/3/11 | $1,358,165 | $1,349,175 | UCONN 2000, Research/Grant |
| Compost Facility | 901268 | Financially Closed | 6/23/09 | $670,000 | DM | |
| CSST Gas Piping Replacement | 901515 | Financially Closed | 6/23/09 | $550,000 | $208,886 | Departmental Funds |
| Decentralized Heat at Central Warehouse and Facilities Operations & Building Services Buildings | FO500001 | Financially Closed | 6/28/17 | $700,000 | $616,864 | University Funds |
| Department of Physical Therapy Relocation | TL2199 | Financially Closed | 9/29/16 | $565,000 | University Funds | |
| Depot Store House – Roof Replacement | 201514 | Financially Closed | 6/10/10 | $637,000 | $552,699 | Departmental Funds |
| East Campus Steam & Condensate Piping Replacement at Avery Point Campus | 901198 | Financially Closed | 4/15/08 | $2,085,000 | DM | |
| Ecology and Evolutionary Biology Greenhouse Renovations | 201583 | Financially Closed | 4/23/14 | $1,000,000 | $264,200 | University Funds |
| Emergency Generator Replacement @ High Head Pump Station | FO500006 | Financially Closed | 1/30/19 | $1,106,040 | University Funds | |
| Energy Services Performance Contract – Phase I | 902074 | Financially Closed | 2/22/17 | $31,602,000 | UCONN 2000; University Funds | |
| Engineering Building – Engineering & Science Building | 901376 | Financially Closed | 9/27/17 | $95,000,000 | $92,529,568 | UCONN 2000; Other Funds |
| Engineering II Roof Replacement | 902094 | Financially Closed | 5/2/18 | $950,000 | UCONN 2000; University Funds | |
| Engineering II & UTEB Air Conditioning Upgrade | 902123 | Financially Closed | 2/22/17 | $2,500,000 | $2,245,189 | UCONN 2000 |
| Exigent Repair/Replacement of Steam and Condensate Piping | 300157 | Financially Closed | 6/26/19 | $2,000,000 | UCONN 2000 | |
| Facilities Condition Analysis | 901170 | Financially Closed | 5/15/06 | $800,000 | DM | |
| Facilities Operations Building Merger of Parking Services | TL2384 | Financially Closed | 4/27/22 | $682,000 | $679,349 | University Funds |
| Facilities Operations Code Remediation, Infrastructure Upgrades & Reorganization Alteration | 201639 | Financially Closed | 10/29/14 | $990,000 | $814,321 | University Funds |
| Facilities Operations Roof Repair & Restoration | FO500003 | Financially Closed | 2/21/18 | $626,500 | University Funds | |
| Fairfield Circle Reconstruction | 300026 | Financially Closed | 2/21/18 | $900,000 | $556,436 | UCONN 2000; University Funds |
| Family Studies (DRM) Renovations – Elevator Replacement | 901365 | Financially Closed | 3/10/09 | $787,500 | UCONN 2000 | |
| Family Studies Windows | 901293 | Financially Closed | 6/23/09 | $2,193,240 | $1,920,067 | UCONN 2000 |
| Farm Buildings Repair/Replacement – Roof, Façade and Other Repairs | 901366 | Financially Closed | 9/23/08 | $2,000,000 | $1,149,594 | UCONN 2000 |
| Farm Buildings Repair/Replacement – Spring Hill Farm ABSL 2 Facility | 901774 | Financially Closed | 9/27/17 | $3,800,000 | UCONN 2000; University Funds | |
| Fats, Oil and Grease Compliance – Phase I | 201623 | Financially Closed | 6/25/14 | $2,000,000 | $1,596,054 | University Funds |
| Fats, Oil and Grease Compliance – Phase II | 901898 | Financially Closed | 3/30/16 | $5,100,000 | $330,719 | UCONN 2000 |
| Fine Arts at Wadsworth Antheneum | 300054 | Financially Closed | 6/26/19 | $700,000 | University Funds | |
| Fine Arts Building Envelope Repair | 901604 | Cancelled | 12/12/12 | $600,000 | $42,735 | DM |
| Fine Arts Gateway and Pedestrian Access | 901812 | Financially Closed | 4/23/14 | $1,500,000 | $1,350,137 | DM |
| Fine Arts Phase II – Core Building | 901567 | Cancelled | 8/3/11 | $1,200,000 | UCONN 2000 | |
| Fine Arts Phase II – Master Plan | 901369 | Financially Closed | 8/4/09 | $1,050,000 | UCONN 2000 | |
| Fine Arts Phase II – Music & Dramatic Arts Library Renovations Phases I & II | 902011 | Financially Closed | 8/2/17 | $2,100,000 | $2,052,082 | UCONN 2000 |
| Fine Arts Phase II – Photo Lab Ventilation Improvements | 901544 | Financially Closed | 11/5/09 | $700,000 | $541,947 | UCONN 2000 |
| Fine Arts Phase II – Renovation and Improvements | 901667 | Financially Closed | 1/27/20 | $37,530,000 | $35,492,330 | UCONN 2000; University Funds; Gift Funds |
| Fire Alarm Upgrade in the Graduate Student Residences | 901271 | Financially Closed | 12/4/07 | $754,948 | DM | |
| Fire Alarm Upgrade in the West Campus Residences | 901270 | Financially Closed | 12/4/07 | $498,273 | DM | |
| Floriculture Greenhouse | 901367 | Financially Closed | 8/7/13 | $6,832,300 | $6,763,949 | UCONN 2000 & Departmental |
| fMRI – Acquisition and Installation | 201630 | Financially Closed | 6/25/14 | $7,893,000 | $7,293,829 | UCONN 2000; Equipment; University Funds |
| Freitas Ice Forum Renovation and Addition Phase 1 | 300094 |
Financially Closed |
8/1/18 |
$2,000,000 |
$225,650 | UCONN 2000 |
| Gampel Area Bollards | 300067 | Financially Closed | 5/2/18 | $1,250,000 | UCONN 2000 | |
| Gampel Pavilion Dome Ceiling and Roof Repair | 901888 | Financially Closed | 6/26/19 | $11,750,000 | UCONN 2000 | |
| Gampel Pavilion LED Lighting and Controls Upgrade | 201652 | Financially Closed | 9/24/14 | $546,000 | $304,490 | University Funds -Renewable Energy Credits |
| Gampel Pavilion Wireless Infrastructure Expansion | IT1050 | Financially Closed | 6/26/19 | $550,000 | UCONN 2000 | |
| Gant Building Renovations – Data Center Renovations | 901755 | Financially Closed | 12/11/13 | $4,000,000 | $3,071,861 | UCONN 2000 |
| Gant Building Renovations – Immediate Exterior Repairs | 901753 | Financially Closed | 9/27/12 | $8,570,000 | $7,723,461 | UCONN 2000 |
| Gant Building Renovations – Mechanical Repairs | 901769 | Financially Closed | 4/23/14 | $600,000 | $138,002 | UCONN 2000 |
| Gant Building Renovations – Phase1 | 901562 | Financially Closed | 11/5/09 | $560,000 | $382,705 | UCONN 2000 |
| Gant Building Renovations – Phase I (Roof) | 901374 | Financially Closed | 2/22/11 | $2,310,000 | $513,492 | UCONN 2000 |
| Gant IMS Fire Alarm Replacement | 201502 | Financially Closed | 2/22/11 | $1,372,000 | $1,265,594 | DM & Plant Funds |
| Garrigus Suites – Rear Stairway Repair | 901749 | Financially Closed | 9/27/12 | $1,000,000 | $7,123 | DM |
| Gelfenbien Dining Hall Dish Room Renovations | 300080 |
Financially Closed |
1/30/19 |
$840,000 |
$612,803 |
University Funds |
| George J. Sherman Family Sports Complex Track Resurfacing | FO500118 | Financially Closed | 6/30/21 | $763,000 | $740,388 | University Funds |
| George J. Sherman Family Sports Complex Turf Replacement | FO500156 | Financially Closed | 10/26/22 | $1,640,997 | $1,491,815 | University Funds |
| Gulley Hall Drainage | 901407 | Cancelled | 12/12/12 | $400,000 | DM | |
| Gulley Hall Roof and Structural Repair | 901181 | Financially Closed | 12/4/07 | $630,000 | DM | |
| Hale Hall 15KV Electrical Service Repairs | FO500011 | Financially Closed | 5/2/18 | $891,800 | University Funds | |
| Hall Dorm Ground Floor Restoration | 901560 | Cancelled | 12/12/12 | $770,000 | $46,587 | DM |
| Hartford Business School Renovation | 201700 | Financially Closed | 4/26/17 | $4,500,000 | $4,373,842 | University Funds |
| Hartford Relocation Acquisition/Renovation | 901779 | Financially Closed | 11/18/15 | $140,000,000 | $139,027,625 | UCONN 2000 |
| Hawley Armory Building VAMP Renovations | 300007-TL2232 | Financially Closed | 9/26/18 | $925,000 | $906,944 | UCONN 2000; University Funds |
| Hawley Armory Facade and Interior Repairs | 901182 | Financially Closed | 4/15/08 | $2,720,000 | $2,274,299 | DM |
| Heating Plant Upgrade – Boiler Reliability Improvements | 901695 | Financially Closed | 8/7/13 | $840,000 | $489,545 | UCONN 2000 |
| Heating Plant Upgrade – Chiller and Boiler House Roofs | 901951 | Financially Closed | 2/24/16 | $5,100,000 | $4,592,625 | UCONN 2000 |
| Heating Plant Upgrade – Emergency Power System Upgrade | 901697 | Financially Closed | 10/28/15 | $2,500,000 | UCONN 2000 | |
| Heating Plant Upgrade – Upgrade Chilled Water System | 901696 | Financially Closed | 8/6/14 | $6,250,000 | $5,047,879 | UCONN 2000 |
| Heating Plant Upgrade – Cogeneration Facility | 900886 | Financially Closed | 4/12/05 | $81,900,000 | $24,835,349 | Lease |
| Heating Plant Upgrade – Improve Condensate Return System | 901698 | Financially Closed | 9/25/13 | $1,450,000 | $1,407,352 | UCONN 2000 |
| Hilltop Apartments Correction Action Plan | 201315 | Financially Closed | 8/2/05 | $14,874,500 | $206,792 | Plant Funds |
| Hilltop Apartments Corrective Action Plan – Phase II | 201368 | Financially Closed | 6/20/06 | $9,700,000 | Plant Funds | |
| Hilltop Apartments Corrective Action Plan – Phase III | 201405 | Financially Closed | 12/4/07 | $977,252 | Operating Funds | |
| Historic House Renovations | 901432 | Cancelled | 12/12/12 | $1,400,000 | $196,291 | DM |
| Homer Babbidge Library – Replace Floor Coverings | 901715 | Financially Closed | 4/24/13 | $1,000,000 | $776,623 | DM |
| Horsebarn Hill Pedestrian Safety Improvements | 902121 |
Financially Closed |
3/27/19 | $1,750,000 |
UCONN 2000; University Funds | |
| Horsebarn Hill Sewage Pump Station Upgrade | FO500016 |
Financially Closed | 6/26/19 |
$1,500,000 |
$1,404,745 | University Funds |
| Human Development Building Parking Lot | 901378, 901418 | Financially Closed | 6/23/09 | $505,000 | DM | |
| Information Technologies Engineering Building Classroom Laboratory Renovations | TL2231 | Financially Closed | 12/7/16 | $900,000 | $522,451 | University Funds |
| Installation of Filter Press | 901368 | Financially Closed | 6/23/09 | $850,000 | $769,331 | DM |
| Interior Remediation, Demolition & Removal of Pharmacy Buildings | 901172 | Financially Closed | 6/19/07 | $1,105,832 | DM | |
| Intramural, Recreational & Intercollegiate Facilities | 201188 | Financially Closed | 9/26/06 | $48,777,660 | UCONN 2000 | |
| Jorgensen Freight Elevator Modernization | FO500135 | Financially Closed | 12/7/22 | $550,000 | $536,870 | University Funds |
| Jorgensen Renovation – Auditorium Seating Replacement | 901553 | Financially Closed | 11/9/10 | $2,162,000 | DM, Operating & Gifts | |
| Jorgensen Renovation – Fire Alarm Replacement | 901506 | Financially Closed | 4/21/09 | $825,000 | $823,004 | UCONN 2000 |
| Jorgensen Renovation – HVAC Renewal | 901989 | Financially Closed | 4/27/16 | $1,850,000 | $1,814,654 | UCONN 2000 |
| Jorgensen Renovation – Phase I | 901274 | Financially Closed | 4/21/09 | $1,375,000 | $1,261,471 | UCONN 2000 |
| Kellogg Dairy Center Robotic Milkers Addition | 201679 | Financially Closed | 6/27/18 | $1,860,000 | $1,856,602 | University Funds |
| Kinesiology Building Human Anatomy Learning Laboratory Renovation | 300188-TL2355 | Financially Closed | 12/9/20 | $753,500 | $517,055 | UCONN 2000 |
| Koons Hall Renovation | 902124 | Financially Closed | 2/22/17 | $5,500,000 | UCONN 2000 | |
| Koons Hall Renovation/Addition – Windows, Facade and Mechanical | 901379 | Financially Closed | 6/23/11 | $1,200,000 | $1,080,057 | UCONN 2000 |
| Lakeside Renovation | 901105 | Financially Closed | 4/11/06 | $5,237,231 | $1,435,200 | UCONN 2000 |
| Landfill Closure | 900748 | Financially Closed | 6/23/09 | $28,123,049 | $26,971,924 | DM |
| Landscape Barn and Administrative Building Replacement | 300147 | Financially Closed | 3/27/19 | $1,400,000 | UCONN 2000 | |
| Law School Campus Center | 201662 | Financially Closed | 3/29/17 | $655,000 | $642,915 | Gifts |
| Law School Facade Restoration Phase II – Hosmer Hall | 902125 | Financially Closed | 4/26/17 | $1,200,000 | $1,175,062 | UCONN 2000 |
| Law School Library Cooling Tower Replacement | FO500019 |
Financially Closed | 9/26/18 |
$600,000 |
University Funds | |
| Law School Renovations/Improvements-Hosmer Façade Restoration | 901957 | Financially Closed | 8/10/16 | $675,000 | $603,643 | UCONN 2000 |
| Law School Renovations/Improvements – Facade Restoration | 901169 | Financially Closed | 3/23/10 | $20,330,113 | $7,980,240 | UCONN 2000 & State Bonds |
| Law School Renovations/Improvements – Hartranft Elevator | 901131 | Financially Closed | 8/2/05 | $1,095,600 | $82,775 | UCONN 2000 |
| Law School Renovations/Improvements – Knight Hall Room 215 Classroom Renovation | 901589 | Financially Closed | 9/28/11 | $575,000 | $401,760 | UCONN 2000 |
| Law School Renovations/Improvements – Starr, Chase & Knight Halls Envelope Repair | 901188 | Financially Closed | 2/28/12 | $3,000,000 | $2,500,189 | UCONN 2000 |
| Lightning and Grounding Protection for Hilltop Apartments and Charter Oak Suites | 901350 | Financially Closed | 6/23/09 | $715,000 | $411,973 | Departmental Funds |
| Litchfield and Windham Hall Electrical Service Repairs | FO500012 | Financially Closed | 5/2/18 | $500,000 | University Funds | |
| Main Campus Parking Replacements | 300023 | Financially Closed | 8/1/18 | $12,000,000 | UCONN 2000; University Funds | |
| Main Campus Substation Switchgear Relay Replacement | FO500090 | Financially Closed | 6/29/22 | $640,000 | $614,796 | University Funds |
| Main Water Supply Line Replacement Phase I | 901634 | Financially Closed | 6/25/14 | $7,000,000 | $3,295,408 | DM |
| Main Water Line Replacement Phase II | 901819 | Financially Closed | 9/29/16 | $3,750,000 | $3,361,222 | UCONN 2000 |
| Manchester Hall Renovation – Envelope repairs (Window Replacement) | 901644 | Financially Closed | 3/28/12 | $850,000 | $584,765 | UCONN 2000 |
| Mansfield Apartment Bathrooms – Phase II | 201641 | Financially Closed | 4/23/14 | $500,000 | $377,565 | University Funds |
| Mansfield Road Realignment | 901206 | Financially Closed | 4/20/10 | $2,100,000 | $1,756,910 | DM & Plant Funds |
| Mansfield Training School – Existing Condition Surveys & Master Planning | 901370 | Financially Closed | 6/24/08 | $600,000 | UCONN 2000 | |
| Mansfield Training School Improvements – Merritt Building | 901213 | Cancelled | 9/24/14 | $3,250,000 | $371,187 | UCONN 2000 |
| Mansfield Training School Improvements – Longley Renovations | 901281 | Cancelled | 9/25/07 | $1,000,000 | $13,241 | UCONN 2000 |
| Master Plan 2014 Development | 201631 901848 901849 901850 901851 901852 901853 | Financially Closed | 2/26/14 | $3,000,000 | $2,229,867 | UCONN 2000; University Funds |
| McMahon Dining Hall Renovations | 201357 | Financially Closed | 1/25/12 | $9,900,000 | $9,430,158 | UCONN 2000 & Departmental Funds |
| McMahon Kitchen Alterations | 201634 | Financially Closed | 12/10/14 | $885,935 | $706,306 | University Funds |
| Memorial Stadium Demolition | 201586 | Financially Closed | 4/25/12 | $800,000 | $432,149 | Gifts |
| Meter Installation – Multiple Locations | 901193 | Financially Closed | 9/26/06 | $600,000 | DM | |
| Meter Installation – Multiple Locations (Phase II) | 901326 | Financially Closed | 1/22/08 | $600,000 | $551,404 | DM |
| Meter Installation – Multiple Locations (Phase III) | 901371 | Financially Closed | 6/23/09 | $600,000 | $469,538 | DM |
| Microgrid Research Program at the Depot Campus | 201635 | Financially Closed | 12/11/13 | $3,000,000 | $18,233 | University Funds; Grant Funds |
| Mirror Lake Dredging and Related Improvements | 901392 | Cancelled | 12/12/12 | $3,400,000 | $214,340 | Operating, DM |
| Natural History Museum Completion | 901124 | Financially Closed | 9/26/06 | $1,022,997 | $499,669 | UCONN 2000 |
| Nayden Clinic Relocation | 901166 | Financially Closed | 8/21/08 | $892,000 | DM | |
| NER East Steam Repair (Phase 1) | 300185 | Financially Closed | 4/27/21 | $650,000 | $280,140 | UCONN 2000 |
| New Faculty Renovations – White Building, Animal Science Lab | 901757 | Financially Closed | 12/11/13 | $1,865,000 | $1,584,189 | DM |
| New 16″ Water Main – Towers to Glenbrook and North Eagleville | 901422 | Financially Closed | 4/20/10 | $2,300,000 | $1,890,196 | DM |
| North and East Area Residence Halls – Security Camera System | 300020 | Financially Closed | 5/2/18 | $1,750,000 | $1,471,333 | UCONN 2000 |
| North Campus Dish Room Renovation | 300161 |
Financially Closed | 12/11/19 |
$850,000 |
$696,274 | University Funds |
| North Campus Student Room Renovations | 300232 | Financially Closed | 3/30/22 | $2,415,000 | $2,149,631 | University Funds |
| North Eagleville Road Area Infrastructure Repair/Replacement & Upgrade – Phase I | 901752 | Financially Closed | 6/3/14 | $3,000,000 | $2,661,146 | UCONN 2000 |
| North Eagleville Road Area Infrastructure Repair/Replacement & Upgrades – Phase II | 901954 | Financially Closed | 4/27/16 | $5,500,000 | $5,485,021 | UCONN 2000 |
| North Eagleville Road Area Infrastructure Repair/Replacement and Upgrades – Phase III | 901990 | Financially Closed | 2/26/20 | $57,500,000 | $56,300,124 | UCONN 2000; Other Funds |
| Northeast Science Quad Site Improvements | 300045 |
Financially Closed |
2/27/19 |
$2,000,000 |
UCONN 2000; University Funds | |
| North Hillside Road Completion | 900965 | Financially Closed | 8/6/14 | $20,365,000 | UCONN 2000; Federal & State GO Bonds | |
| North Hillside Road Tennis Courts | 201316 | Financially Closed | 8/2/05 | $900,000 | Departmental Funds | |
| North & South Parking Garage – Safety Screen | 901979 | Financially Closed | 8/10/16 | $885,000 | $821,126 | UCONN 2000 |
| Northwest Science Quad Infrastructure – Phase 3 | 300103 |
Financially Closed | 10/31/18 |
$700,000 | UCONN 2000 | |
| Old Central Warehouse | 901266 | Withdrawn | 8/3/11 | $2,126,000 | $126,000 | UCONN 2000 |
| OSFM Code Remediation: Babbidge Library Emergency Lights | 901801 | Financially Closed | 6/25/14 | $4,000,000 | $2,008,969 | UCONN 2000 |
| OSFM Fine Arts Complex Code Correction | 901175 | Financially Closed | 6/23/09 | $957,738 | $886,987 | Plant Funds |
| OSFM Law School Code Remediation – Hosmer (Chase) Hall | 901249 | Financially Closed | 1/12/09 | $590,000 | $544,502 | DM |
| OSFM Legacy Code Remediation | 901259 | Financially Closed | 1/26/11 | $9,000,000 | $8,845,365 | DM |
| Parking Garage Repair and Upgrade | 901410 | Financially Closed | 4/21/09 | $1,305,000 | DM | |
| Pedestrian Safety Improvements – Core Campus Phase I | 901577, 901734, 901735 | Financially Closed | 4/24/13 | $6,591,000 | $3,420,209 | UCONN 2000 |
| Pedestrian Safety Improvements – CUE/Gentry Corridor | 901627 | Financially Closed | 8/3/11 | $1,240,350 | $407,823 | DM |
| Pedestrian Safety Improvements – Hillside Road | 901726 | Financially Closed | 9/27/12 | $3,000,000 | $2,730,270 | DM |
| Pedestrian Safety Improvements – Phase I | 901629 | Financially Closed | 4/24/13 | $4,000,000 | $2,636,028 | UCONN 2000 |
| Phase I of the Fire Alarm Upgrade Project | 901174 | Financially Closed | 6/20/06 | $2,300,000 | $378,635 | DM |
| Phillips Communication Building Air Distribution and Lighting System | 901902 | Financially Closed | 2/24/16 | $1,1000,000 | $1,082,646 | UCONN 2000 |
| Psychology Building Renovation/Addition | 901388 | Financially Closed | 4/25/12 | $25,170,550 | $1,014,403 | UCONN 2000 |
| Psychology Fire Alarm Replacement | 201495 | Financially Closed | 6/23/09 | $506,000 | $497,046 | Plant Funds |
| Public Safety Complex Improvements | 201574 | Financially Closed | 8/3/11 | $3,000,000 | $79,146 | University Funds |
| Public Safety Security Garage and Storage Facility | 901384 | Financially Closed | 6/23/09 | $568,311 | $542,877 | DM |
| Putnam Refectory Renovation | 901820 | Financially Closed | 3/25/15 | $23,000,000 | $18,729,247 | UCONN 2000 |
| RCX Program Avery Point Marine Sciences Building | FO500047 | Financially Closed | 4/24/19 | $526,950 | University Funds | |
| Recreation Center | 901332 | Financially Closed | 4/26/17 | $100,000,000 | $97,140,077 | University Funds |
| Recreational Sport Field Repair/Replacement – Depot Campus | 201439 | Financially Closed | 4/20/10 | $1,167,900 | $1,088,720 | Departmental Funds |
| Renovations for New Faculty – Pharmacy Biology Building | 901730 | Financially Closed | 6/28/12 | $1,300,000 | $1,105,568 | DM & Departmental |
| Renovations of Longley Building for Additive Manufacturing Research | 901731 | Financially Closed | 6/28/12 | $800,000 | $747,469 | DM & Departmental |
| Repair & Renovation of Avery Point Pool & Gym Facility | 901173 | Financially Closed | 5/14/07 | $3,145,273 | DM | |
| Repair & Renovation of the Sherman Athletic Complex | 901243 | Financially Closed | 1/22/08 | $2,641,824 | DM & Departmental | |
| Repair of Water Tank #2 | 901652 | Financially Closed | 9/27/12 | $1,700,000 | $1,277,465 | DM |
| Replace Gampel Chillers | 901869 | Financially Closed | 6/24/15 | $1,446,000 | $1,183,020 | UCONN 2000 |
| Replace Gampel Cooling Towers | 901795 | Financially Closed | 6/24/15 | $3,000,000 | $2,941,932 | UCONN 2000 |
| Replacement of Chemical House (Well Water Treatment Facility) | 901320 | Financially Closed | 11/5/09 | $3,500,000 | $2,951,874 | DM |
| Replacement of Two Water Towers | 901311 | Financially Closed | 4/21/09 | $2,500,000 | $2,094,618 | DM |
| Residential Life Facilities – Alumni Quad Shower Renovations | 201704 | Financially Closed | 6/28/17 | $1,156,000 | $1,054,238 | UCONN 2000; University Funds |
| Residential Life Facilities – Alumni Quad Shower Renovations Phase II | 300048 | Financially Closed | 2/21/18 | $1,430,000 | $873,419 | University Funds |
| Residential Life Facilities – Alumni Residence Hall Granite Restoration | 902049 | Financially Closed | 2/21/18 | $645,000 | UCONN 2000 | |
| Residential Life Facilities – Brock, Russell and Batterson Halls Shower Improvements | 901934 | Cancelled | 3/25/15 | $630,000 | $9,529 | UCONN 2000 |
| Residential Life Facilities – Connecticut Commons Renovation | 201554 | Financially Closed | 8/3/11 | $6,250,000 | $5,019,350 | UCONN 2000, Departmental Funds |
| Residential Life Facilities – Hale and Ellsworth Halls Elevator Replacement | 201511 | Financially Closed | 4/20/10 | $2,140,000 | $1,240,920 | Departmental Funds |
| Residential Life Facilities – Hilltop Apartment Complex Roof Repairs Phase I | 201629 | Financially Closed | 3/25/15 | $2,378,000 | $2,344,432 | University Funds |
| Residential Life Facilities – Hilltop Apartment Complex Roof Repairs Phase II | 902071 | Financially Closed | 2/24/16 | $2,551,000 | $1,864,872 | UCONN 2000 |
| Residential Life Facilities – Hilltop Apartment Complex Roof Repairs – Phase III | 902134 | Financially Closed | 3/29/17 | $1,762,000 | $1,519,493 | UCONN 2000 |
| Residential Life Facilities- Honors Residence Hall | 901804 | Financially Closed | 04/29/15 | $10,000,000 | UCONN 2000 | |
| Residential Life Facilities – NextGen Hall | 901805 | Financially Closed | 9/29/16 | $100,500,000 | $95,792,776 | UCONN 2000; Revenue Bonds |
| Residential Life Facilities – Holcomb, Whitney, Sprague Masonry Repairs | 901471 | Financially Closed | 6/10/10 | $800,000 | Departmental Funds | |
| Residential Life Facilities – Husky Village Housing Complex Heating Upgrades | 901871 | Financially Closed | 12/10/14 | $600,000 | $569,099 | UCONN 2000 |
| Residential Life Facilities – Mansfield Apartments Redevelopment | 300234 | Financially Closed | 6/29/22 | $12,000,000 | $8,234,201 | UCONN 2000 |
| Residential Life Facilities – North Campus Residence Hall Renovations Phase II | 300164 |
Financially Closed | 2/26/20 | $2,170,000 | $1,817,004 | UCONN 2000 |
| Residential Life Facilities – McMahon Elevator Replacement | 201512 | Financially Closed | 11/9/10 | $2,202,000 | $1,220,202 | University Funds |
| Residential Life Facilities – North Campus Residence Halls Roof Refurbishment Phase II | 300124 |
Financially Closed | 1/30/19 |
$1,576,000 |
UCONN 2000 | |
| Residential Life Facilities – Northwest Shower Renovations | 201705 | Financially Closed | 4/26/17 | $1,020,000 | $1,000,098 | UCONN 2000; University Funds |
| Residential Life Facilities – Northwood Roof and Envelope Repair | 902067 | Financially Closed | 6/29/16 | $518,000 | $470,243 | UCONN 2000; University Funds |
| Residential Life Facilities – Northwood Roof Replacement – Phase II | 201701 | Financially Closed | 3/29/17 | $1,550,000 | $1,285,072 | UCONN 2000; University Funds |
| Residential Life Facilities – Restroom Rehabilitation | 300112 |
Financially Closed |
1/30/19 |
$2,200,000 |
University Funds | |
| Residential Life Facilities – Shippee Hall Elevator Replacement | 901449 | Financially Closed | 11/18/08 | $600,000 | UCONN 2000 | |
| Residential Life Facilities – South Campus Envelope: Architectural Precast Stone Repairs | 901833 | Financially Closed | 4/23/14 | $4,500,000 | $4,407,974 | UCONN 2000 |
| Residential Life Facilities – South Campus Envelope – Gable Repairs & Protective Work | 901813 | Financially Closed | 6/3/14 | $3,000,000 | $1,624,489 | UCONN 2000 |
| Residential Life Facilities – South Campus Envelope Repairs | 201614 | Financially Closed | 3/29/17 | $13,315,000 | $11,798,413 | UCONN 2000 University Funds |
| Residential Life Facilities – Sprinkler Installation & Miscellaneous Repairs at Mansfield Apartments | 901284 | Financially Closed | 6/23/09 | $4,000,000 | Departmental Funds | |
| Residential Life Facilities – Sprinkler Installation & Miscellaneous Repairs at Northwood Apartments | 901283 | Financially Closed | 6/23/09 | $3,000,000 | $2,623,293 | Departmental Funds |
| Residential Life Facilities – Hale and Ellsworth Exterior Masonry Repairs | 901710 | Financially Closed | 4/24/13 | $2,000,000 | $992,612 | UCONN 2000 |
| Residential Life Facilities – West Campus Shower Renovations | 901949 | Financially Closed | 6/29/16 | $2,360,000 | $2,263,124 | UCONN 2000; University Funds |
| Residential Life Facilities – Whitney Hall Renovations | 901908 | Financially Closed | 12/10/14 | $685,000 | $681,864 | UCONN 2000 |
| Residential Life Facilities – Wilson Hall / Reheat Coils | 901878 | Financially Closed | 2/24/16 | $560,000 | $542,332 | UCONN 2000 |
| Residential Life Facilities – Window Replacement Graduate Residence Halls | 201524 | Financially Closed | 2/18/10 | $2,300,000 | Departmental | |
| Residential Life Facilities – Window Replacement Project for Grange Hall, Hicks Hall, Shippee Dining Facility and Northwood Complex | 201555 | Financially Closed | 4/24/13 | $3,990,000 | $3,882,432 | UCONN 2000 & Departmental |
| Residential Life Facilities – Window Replacement Project For Holcomb, Whitney, Sprague, Shippee Grad Dorms and Northwood Apartments | 901450 | Financially Closed | 6/23/09 | $2,000,000 | Departmental | |
| Residential Life Window Replacement Project for Alumni Quad and Buckley Hall | 201438 | Financially Closed | 4/15/08 | $2,100,000 | Departmental | |
| Residential Life Window Replacement Project for Hale Hall, Ellsworth Hall, West Campus and McMahon Hall | 201309 | Financially Closed | 11/18/08 | $3,071,600 | Departmental Funds | |
| Roads, Sidewalks and Miscellaneous Repairs – Phase III | 901618 | Financially Closed | 1/26/11 | $850,000 | $90,558 | DM |
| Rodent Barrier Facility | 201582 | Cancelled | 4/24/13 | $2,400,000 | $152,112 | Research |
| Roof Repair & Rehabilitation – Monteith Hall | 901155 | Financially Closed | 11/15/05 | $250,000 | DM | |
| Rt 195 Sewer Line Replacement – Area 1 | 201558 | Financially Closed | 4/13/11 | $550,000 | $300,791 | Operating |
| Ryan Refectory Renovations | 901167 | Financially Closed | 11/14/06 | $2,970,000 | DM | |
| SCADA (Supervisory Control and Data Analysis) System | 901196 | Financially Closed | 1/22/08 | $1,300,000 | DM | |
| School of Engineering Backfill Project | TL2405 | Financially Closed | 6/29/22 | $1,777,410 | $1,740,907 | University Funds |
| School of Engineering Renovations | 901508 | Financially Closed | 2/18/10 | $1,411,000 | $1,203,348 | DM, Departmental, Eminent Faculty |
| School of Pharmacy/Biology Completion | 900330 | Financially Closed | 1/31/06 | $94,609,000 | $93,204,049 | UCONN 2000 |
| School of Pharmacy Medicinal Garden | 300053 | Financially Closed | 8/1/18 | $915,000 | UCONN 2000 | |
| Security Upgrades – Hilltop Apartments | 201505 | Financially Closed | 6/10/10 | $967,000 | $623,372 | Departmental |
| Sewage Treatment Plant Clarifier Repairs | 901192 | Financially Closed | 2/27/08 | $1,190,000 | DM | |
| Sewer Line Replacement at Storrs Road Pump Station | 901675 | Financially Closed | 4/27/16 | $5,250,000 | $4,688,871 | UCONN 2000 |
| Sherman Family Sports Complex Restoration | FO500034 | Financially Closed | 3/27/19 | $1,070,000 | University Funds | |
| Shippee Dining Hall Renovations | 201545 | Financially Closed | 9/27/12 | $4,000,000 | $3,884,592 | Departmental Funds |
| Small Capital Projects Fund | 901693 | Financially Closed | 9/28/11 | $1,500,000 | $1,249,669 | DM |
| South Campus Commons Landscape and Pedestrian Improvements Plan | 902084 | Financially Closed | 2/26/20 | $5,000,000 | UCONN 2000 | |
| South Campus Express Line Modifications (Water & Sewer Distribution) | 901316 | Cancelled | 12/12/12 | $360,000 | DM | |
| South Campus Fire Alarm Upgrade | 901269 | Financially Closed | 4/15/08 | $667,085 | DM | |
| Southeast Campus Infrastructure Upgrades | 300065 |
Financially Closed |
1/30/19 |
$5,000,000 |
UCONN 2000 | |
| South Garage Slope and Ramp Repair | 901178 | Financially Closed | 4/20/10 | $607,200 | $478,363 | DM |
| South Campus Stair Repair | 901883 | Financially Closed | 8/10/16 | $765,000 | UCONN 2000 | |
| Southwest Campus Infrastructure Upgrade | 902091 | Financially Closed | 8/1/18 | $10,000,000 | UCONN 2000 | |
| Stamford Campus Carpet Replacement | 901334 | Financially Closed | 12/4/07 | $657,504 | Operating Funds | |
| Stamford Campus Improvements/Housing | 901798 | Financially Closed | 9/25/13 | $290,000 | $320,416 | UCONN 2000; University Funds |
| Stamford Campus Improvements/Housing: Cooling Tower Replacement | 901904 | Financially Closed | 3/30/16 | $700,000 | $670,891 | UCONN 2000 |
| Stamford Campus Improvements – Parking Garage Repairs | 901090 | Financially Closed | 6/19/07 | $435,000 | $18,676 | UCONN 2000 |
| Stamford Campus Surface Parking | 300024 | Financially Closed | 2/21/18 | $4,500,000 | $3,917,512 | UCONN 2000 |
| Stamford Parking Garage Repair and Maintenance Program | 901583 | Financially Closed | 4/20/10 | $1,962,434 | $1,569,215 | DM |
| Steam & Condensate Distribution System Replacements – Phase I | 901317, 901372, 901421 | Financially Closed | 9/21/10 | $4,014,537 | $3,924,663 | DM |
| Steam Line Lateral at the John J. Budds Building | FO500002 | Financially Closed | 6/28/17 | $800,000 | $466,124 | University Funds |
| Steam Line Repairs-Koons, Family Studies, Manchester Halls | 902118 | Financially Closed | 2/21/18 | $2,785,000 | $2,613,255 | UCONN 2000; University Funds |
| Steam Line Repairs-Vault 304 to Central Utility Plant | 300075 | Financially Closed | 2/21/18 | $700,000 | University Funds | |
| Storrs Hall Addition | 901265 | Financially Closed | 4/13/11 | $14,825,000 | $14,180,268 | UCONN 2000 & Departmental |
| Storrs Hall Addition – Windows and Exterior Repairs | 901575 | Financially Closed | 1/26/11 | $740,000 | $612,927 | UCONN 2000 |
| Street Construction/Sidewalk Repairs and Related Improvements – Phases l & ll | 901318 | Financially Closed | 6/23/09 | $2,600,000 | DM | |
| Student Union Addition | 900576 | Financially Closed | 6/20/06 | $70,755,303 | $12,519,120 | UCONN 2000 |
| Student Union Building Envelope Repairs | 902052 | Financially Closed | 3/30/16 | $1,500,000 | $1,458,945 | UCONN 2000; University Funds |
| Student Union – QSR Dining Services | 300106 | Financially Closed | 4/24/19 | $700,000 | University Funds | |
| Student Union Quadrangle Site Work and Landscape-Phase l | 901101 | Financially Closed | 6/19/07 | $1,400,000 | DM | |
| Student Union Quadrangle Site Work and Landscape-Phase ll | 901440 | Financially Closed | 11/9/10 | $1,150,000 | $1,113,367 | DM |
| Student Union Steam and Condensate Service Replacement Repairs | 902088 | Financially Closed | 6/29/16 | $1,250,000 | $1,154,993 | UCONN 2000 |
| Support Facility (Architectural and Engineering Services) | 901390 | Cancelled | 12/12/12 | $500,000 | UCONN 2000 | |
| Tech Park Parking Lot | 902079 | Financially Closed | 4/26/17 | $1,450,000 | $1,351,620 | UCONN 2000; University Funds |
| Technology Quadrant Phase III – Innovation Partnership Building | 901661 | Financially Closed | 12/10/14 | $162,300,000 | $157,952,110 | State GO Bond |
| Technology Quadrant Phase III – Water Supply | 901662 | Financially Closed | 8/6/14 | $808,000 | $773,547 | State GO Bond |
| Tie in Drum Heater on Boilers at CUP (Central Utility Plant) | 901319 | Financially Closed | 8/3/11 | $104,500 | $78,059 | DM |
| Torrey 1st Floor East Renovations | 901572 | Financially Closed | 11/9/10 | $3,500,000 | $3,187,970 | DM, Research, Departmental Funds |
| Torrey Life Sciences 2nd Floor Biology Renovation | 300152 | Financially Closed | 12/11/19 | $900,000 | $806,634 | UCONN 2000 |
| Torrey Life Sciences Code Correction | 901260 | Financially Closed | 12/4/07 | $500,000 | DM | |
| Torrey Life Sciences Fire Alarm Replacement | 201503 | Financially Closed | 11/9/10 | $587,000 | $573,566 | University Funds |
| Torrey Life Sciences Relocation | 901158 | Financially Closed | 9/20/05 | $645,000 | $75,000 | DM |
| Torrey Renovation Completion & Biology Expansion – Roof Replacement | 901806 | Financially Closed | 9/24/14 | $1,012,500 | $789,068 | UCONN 2000 |
| Torrington ADA Improvements | 901201 | Financially Closed | 6/19/07 | $650,000 | DM | |
| Torrington Campus Improvements | 901375 | Financially Closed | 8/10/10 | $340,000 | $320,874 | UCONN 2000 |
| UCFM Code Remediation: Avery Point Branford House Phase II | 901895 | Financially Closed | 2/24/16 | $625,000 | $592,407 | UCONN 2000 |
| UCFM Code Remediation: Campus Wide Laundry Alterations | 901840 | Financially Closed | 4/24/19 | $3,300,000 | UCONN 2000 | |
| UCFM Code Remediation: Charter Oak Apartments | 901476 | Financially Closed | 4/20/10 | $537,000 | $475,578 | University Funds |
| UCFM Code Remediation: Charter Oak Apartments – 3rd Floor Attic Sprinklers | 201542 | Financially Closed | 4/20/10 | $1,387,000 | Departmental | |
| UCFM Code Remediation: Gampel Pavilion Fire Alarm Replacement | 901552 | Financially Closed | 4/20/10 | $2,200,000 | $747,549 | DM |
| UCONN 2000 Code Remediation: Alumni Quad | 201483 | Financially Closed | 9/24/14 | $766,000 | $688,954 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: Holcomb/Whitney/Sprague Dormitories | 201464 | Financially Closed | 9/30/15 | $575,000 | $528,282 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: Mansfield Apartments | 201471 | Financially Closed | 6/29/16 | $3,600,000 | $2,906,472 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: New Central Warehouse | 201549 | Financially Closed | 3/25/15 | $650,000 | $599,474 | University Funds |
| UCONN 2000 Code Remediation: North Campus Dormitories | 201478 | Financially Closed | 201478 | $1,085,000 | $770,114 | University Funds |
| UCONN 2000 Code Remediation: Northwest Quad | 201413 | Financially Closed | 10/28/15 | $1,323,000 | UCONN 2000; University Funds | |
| UCONN 2000 Code Remediation: South Campus Laundry Alterations | 201569 | Financially Closed | 5/2/18 | $940,000 | $831,319 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: Starr Hall | 201595 | Financially Closed | 9/24/14 | $631,000 | $630,958 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: Towers Dormitories | 201472 | Financially Closed | 6/28/17 | $800,000 | 776,931 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: White Building/Dairy Bar Improvements | 201568 | Financially Closed | 9/30/15 | $550,000 | $539,516 | UCONN 2000; University Funds |
| UCONN 2000 Code Remediation: Wilbur Cross Building | 201525 | Financially Closed | 9/27/17 | $1,640,000 | UCONN 2000; University Funds | |
| UPDC Relocation | 300207 | Financially Closed | 9/29/21 | $960,000 | $914,556 | UCONN 2000 |
| United Technology Engineering Building – Freshman Design Teaching Laboratory Renovation | 300089 | Financially Closed | 5/2/18 | $525,000 | UCONN 2000 | |
| Utility Framework – Utility System Modeling | 902040 | Financially Closed | 2/24/16 | $850,000 | $749,572 | UCONN 2000 |
| Utility Infrastructure GIS Mapping | 902035 | Financially Closed | 3/30/16 | $3,236,000 | UCONN 2000 | |
| Water Pollution Control Facility Sludge Processing Plant | 902116 | Financially Closed | 9/29/16 | $1,500,000 | University Funds | |
| Waterbury Campus Property Transfer (Old Campus) | 901097 | Financially Closed | 9/22/09 | $1,180,000 | $648,275 | DM & Departmental |
| Waterbury Downtown Campus – Courtyard Landscaping and Art Work | 901179 | Financially Closed | 3/23/10 | $934,100 | $500,000 | UCONN 2000 & Gifts |
| Waterbury Downtown Campus – Rectory Renovations | 901830 | Financially Closed | 4/26/17 | $2,550,000 | $1,965,045 | UCONN 2000; University Funds |
| Water Pollution Control Facility Priority One Repairs | 901810 | Financially Closed | 9/24/14 | $3,000,000 | $2,332,014 | UCONN 2000 |
| Water Reclamation Facility | 901229 | Financially Closed | 1/26/11 | $28,951,000 | $28,743,125 | University Funds |
| West Hartford Campus Renovations/Improvements – 1800 Asylum Boiler Replacement | 901538 | Financially Closed | 4/13/11 | $850,000 | $699,218 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Chemistry Lab | 901569 | Financially Closed | 9/21/10 | $1,469,000 | $1,466,129 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Electrical Switchgear Replacement | 901286 | Financially Closed | 2/28/12 | $1,024,700 | $960,465 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Parking Lot | 901110 | Financially Closed | 8/2/05 | $850,000 | $350,000 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Phase l | 901285 | Financially Closed | 6/10/10 | $1,400,000 | $1,284,018 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Replace Trecker Library Air Handling Unit | 901539 | Financially Closed | 6/10/10 | $525,000 | $40,208 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – School of Social Work Building Envelope | 901524 | Financially Closed | 9/22/09 | $1,000,000 | $905,639 | UCONN 2000 |
| West Hartford Campus Renovations/Improvements – Student Lounge and Office Relocation | 901568 | Financially Closed | 2/22/11 | $839,000 | $795,149 | UCONN 2000 |
| Whetten Renovations & Code Remediation | 201640 | Financially Closed | 12/10/14 | $710,000 | $587,492 | UCONN 2000; University Funds |
| Whitney Dining Hall Renovations | 201687 | Financially Closed | 1/30/19 | $4,200,000 | University Funds | |
| Wilbur Cross Facade Repairs | 901185 | Financially Closed | 4/15/08 | $1,754,500 | DM | |
| Wilbur Cross Reading Room Renovation | 300001 | Financially Closed | 2/21/18 | $3,200,000 | UCONN 2000; University Funds | |
| Willimantic River Water Transmission Line – Partial Replacement | 901062 | Financially Closed | 9/26/06 | $712,819 | DM | |
| Wood Hall Facade Repair | 901601 | Financially Closed | 6/23/11 | $1,000,000 | $826,628 | DM |
| W & T Lot Electrical and Parking Restoration | FO500030 | Financially Closed | 2/27/19 | $2,844,000 | University Funds | |
| Y & Z Parking Lots, Repaving and Electrical Restoration Phase 1 & 2 | FO500076 | Financially Closed | 9/30/20 | $2,377,000 | $1,933,846 | University Funds |
| Young Building Renovation/Addition | 901373 | Financially Closed | 4/24/13 | $19,773,430 | $18,916,921 | UCONN 2000; University Funds; Gifts |
| Young Envelope Renovation/Addition – Envelope Repairs | 901811 | Financially Closed | 4/27/16 | $5,600,000 | $5,254,425 | UCONN 2000 |
UConn Health: |
Project # | Phase | Approved | Budget | Actual Cost | Primary $ Source |
| 16 Munson Road Parking Lot Paving | 22-601.03 | Financially Closed | 9/27/23 | $2,075,000 | $1,377,675 | UCONN 2000 Phase III DM |
| 195 Farmington Avenue Renovation | 13-044 | Financially Closed | 6/25/14 | $3,600,000 | $1,627,520 | UCONN 2000; UCH Capital; Research |
| Ambulatory Care Center | 11-042 | Financially Closed | 9/27/12 | $203,000,000 | $202,263,763 | UCH Private Funding |
| Boiler and Deaerator Tank Repairs | 14-601.12 | Financially Closed | 6/29/16 | $1,860,000 | $1,613,916 | UCONN 2000 |
| Cage Processing Facility Renovations | 10-050 | Financially Closed | 4/25/12 | $9,895,000 | $7,340,320 | UCH Capital; Grant |
| 800 Mhz NMR Installation | 08-014 | Financially Closed | 11/5/09 | $2,900,000 | $2,782,989 | UCH Capital & Grant Funds |
| Academic Building (Bldg. A) Roof Replacement | 07-601.10 | Financially Closed | 4/13/11 | $725,000 | $622,844 | DM |
| Academic Research Building Heat Pipe Replacement | 08-601.01 | Cancelled | 12/12/12 | $1,250,000 | DM | |
| Administrative Services Building Renovations | 10-054 | Financially Closed | 2/28/12 | $3,265,000 | $3,074,048 | UCH Capital |
| Administrative Services Building Renovation to Medical Services Building | 04-6521 | Cancelled | 12/12/12 | $18,000,000 | UCH Capital | |
| Anechoic Chamber Relocation | 12-012 | Financially Closed | 3/26/14 | $598,000 | $460,656 | UCH Capital |
| Catheterization Lab Equipment Replacement | 08-031 | Financially Closed | 11/9/10 | $2,530,000 | $2,198,315 | UCH Capital; Departmental |
| CLAC Renovation | 901133 | Financially Closed | 11/13/13 | $17,960,000 | $17,026,466 | UCONN 2000; UCH Capital |
| Cooling Coil Conversion | 06-704 | Financially Closed | 12/4/07 | $1,408,000 | $1,406,703 | DM |
| Cooling Tower Replacement | Financially Closed | 9/20/05 | $1,818,600 | DM | ||
| CT Simulator – High Dose Radiation Renovations | 10-059 | Financially Closed | 12/12/12 | $1,715,000 | $1,169,547 | UCH Capital |
| Datacenter Infrastructure Improvements | 09-603.01 | Financially Closed | 4/20/10 | $2,055,000 | $1,981,943 | DM |
| Demolish Lower Research Campus | 12-010 | Financially Closed | 9/27/12 | $850,000 | $752,005 | UCH Capital |
| Demolition of Dowling North and Dowling South Buildings | 14-604 | Financially Closed | 12/10/14 | $1,295,000 | $856,833 | DM, Jackson Labs |
| Dental Clinic Fit Out, Storrs Center | 13-023 | Financially Closed | 1/29/14 | $925,000 | $857,797 | UCH Capital |
| Dental Implant Center Renovation | 06006938 | Financially Closed | 9/25/07 | $2,555,000 | $2,439,540 | UCH Capital |
| Dental School CONNcept Clinic Renovation | 10-070 | Financially Closed | 4/13/11 | $1,000,000 | $639,050 | UCH Capital |
| Dental School Renovation – Grasso Phase III – 24/7 Student Lab | 10-053 | Cancelled | 12/12/12 | $485,000 | UCH Capital | |
| Dental School Renovation – Orthodontics Renovation | 901526 | Cancelled | 12/12/12 | $2,290,000 | $70,323 | UCONN 2000 |
| Dental School Renovation – Preclinical Teaching & Prosthetics Labs | 901212 | Financially Closed | 2/18/10 | $2,420,000 | $2,138,939 | UCONN 2000 |
| Dermatology Clinic Renovation – C Main | 17-037 | Financially Closed | 2/26/20 | $2,600,000 | $2,337,872 | UCH Capital |
| Detention Basin Dredging | 08-602.01 | Financially Closed | 9/27/12 | $990,000 | $887,155 | DM |
| Dowling North Renovation | 07-070 | Cancelled | 12/12/12 | $905,000 | UCH Capital | |
| Dowling South Chiller Replacement | 09-019 | Financially Closed | 2/18/10 | $690,000 | UCH Capital | |
| Electric Heat Conversion Project | 07-604 | Financially Closed | 2/27/08 | $1,620,000 | $1,473,686 | DM |
| Electronic Medical Records Project Team Space Fit-Out – New Hospital Tower 7th Floor | 16-016 | Construction Complete | 9/29/16 | $1,575,000 | $1,519,998 | UCH Capital |
| Elevator 24 & 25 Sill Repairs | 08-054 | Financially Closed | 9/27/17 | $1,390,000 | $1,277,262 | UCONN 2000 |
| Elevator 27 & 28 Modernization | 16-601.04 | Financially Closed | 3/29/17 | $725,000 | $643,028 | UCONN 2000 |
| Fire Alarm System Upgrades | 10-068 | Financially Closed | 6/28/12 | $706,000 | $694,380 | UCONN 2000 |
| H Building Sealant Replacement | 16-601.02 | Financially Closed | 9/29/16 | $545,000 | $497,501 | UCONN 2000 |
| John Dempsey Hospital 2nd Floor – ICU Renovation | Cancelled | 12/12/12 | $1,546,000 | UCH Capital | ||
| John Dempsey Hospital 4th Floor Renovation | Cancelled | 12/12/12 | $800,000 | UCH Capital | ||
| John Dempsey Hospital Electro Physiology Lab & Catheterization Lab Renovation, Phase I and II | Financially Closed | 4/11/06 | $5,205,000 | $5,142,470 | UCH Capital | |
| John Dempsey Hospital Emergency Department Expansion | 07-038 | Financially Closed | 3/10/09 | $1,280,000 | $1,064,134 | UCH Capital |
| Library/Student Computer Center Renovation | 901223 | Financially Closed | 4/15/08 | $1,216,491 | $1,020,572 | UCONN 2000 & Gifts |
| Main Accumulation Building | 17-007 | Construction Complete | 6/27/18 | $4,050,000 | $1,872,647 | UCONN 2000; UCH Capital |
| Main Building Clinical Area (“C”) Roof Replacement | 17-604 | Revised Final | 3/27/19 | $1,200,000 | $1,192,748 | UCONN 2000 |
| Main Building Cooling System – Chillers 1, 2 & 3 Replacement | 09-603.02 | Financially Closed | 9/28/11 | $4,945,000 | $4,506,644 | UCONN 2000; UCH Capital |
| Main Building Exterior Facade Joint Sealant Replacement | 08-603.01 | Financially Closed | 2/27/13 | $3,475,000 | $2,820,666 | DM |
| Main Building (L) Lab Renovations – 3rd Floor | 19-007 | Financially Closed | 2/26/20 | $7,800,000 | $6,552,334 | UCH Operating; UCH Gift Funds; UCH IDC Funds |
| Main Building Renovation – Clinical Skills Renovation | 901211 | Financially Closed | 4/10/07 | $1,400,000 | $1,025,655 | UCONN 2000 |
| Main Building Renovation: Lab (“L”) Building Renovations – Project I | 901134 | Financially Closed | 6/24/15 | $78,415,503 | $77,129,024 | UCONN 2000, UCH Capital; Grant |
| Main Building Renovation: Lab (“L”) Building Renovations – Project II | 901772 | Financially Closed | 9/30/15 | $41,389,671 | $38,467,286 | UCONN 2000; UCH Capital |
| Main Cooling System Back – Up Chiller Replacement | 6006894 | Financially Closed | 2/27/08 | $935,000 | $880,765 | DM |
| Medical Arts and Research Building Lab Fit – Out | 07-009 | Financially Closed | 3/13/07 | $560,000 | $550,800 | UCH Capital |
| Medical School Academic Building Addition and Renovations | 901729 | Financially Closed | 6/28/17 | $36,795,000 | $35,880,745 | UCONN 2000; UCH Capital |
| Medical School Academic Building Renovation – Patterson & Massey Auditoria | 901136 | Financially Closed | 9/26/06 | $4,350,000 | $3,697,487 | UCONN 2000 |
| Munson Road Reconfiguration-Phase l | Financially Closed | 1/31/06 | $2,100,000 | $2,065,902 | UCH Capital | |
| Munson Road Renovation and Expanded Parking | 05-006770 | Financially Closed | 9/25/07 | $4,350,000 | UCH Capital | |
| Munson Road Roof Replacement | 11-043 | Financially Closed | 9/29/16 | $3,875,000 | $3,579,513 | UCONN 2000; UCH Capital |
| Musculoskeletal Institute Building Roof Top Unit Replacement |
20-052 | Financially Closed | 6/30/21 | $1,762,500 |
$1,744,069 |
UCH Capital; Eversource Rebate |
| Negative Pressure Room – Building 4 Renovations | 07-082 | Financially Closed | 11/18/08 | $590,000 | $489,521 | Research Funds |
| New 3T MRI Renovations | 15-003 | Financially Closed | 12/16/15 | $3,825,000 | $1,202,090 | UCH Capital |
| New Construction and Renovation | 901590 | Financially Closed | 6/24/15 | $325,866,000 | $316,187,095 | UCONN 2000; UCH Capital |
| New Construction and Renovation – Campus Water Infrastructure Improvements | 901808 | Financially Closed | 11/13/13 | $3,600,000 | $3,600,000 | UCONN 2000; Jackson Labs |
| New Construction and Renovation – Clinic Building (C) Renovations | 901737 | Financially Closed | 3/27/19 | $97,014,604 | $95,529,111 | UCONN 2000; UCH Capital |
| New Construction and Renovation – Roadway and Intersection Improvements | 901797 | Financially Closed | 6/24/15 | $5,786,250 | $5,749,873 | UCONN 2000; Jackson Labs |
| Operating Room 1 Fit-Out | 18-017 | Financially Closed | 6/26/19 | $1,445,000 | $1,074,056 | UCH Capital |
| Parking Lots A, B and C Repavement | 17-603.01 | Financially Closed | 3/29/17 | $637,000 | $520,562 | UCONN 2000 |
| Pharmacy Area USP-800 Regulation Compliance | 19-005 | Financially Closed | 10/23/19 | $1,972,000 | $1,923,019 | UCH Capital |
| Renovate & Repave 195 Farmington Avenue Parking Lot | 16-603.01 | Financially Closed | 9/29/16 | $635,000 | $585,335 | UCONN 2000 |
| Research Tower | 901132 | Financially Closed | 9/21/10 | $49,565,000 | $49,248,989 | UCONN 2000 |
| Research Tower – Incubator Lab Addition to the Cell & Genome Sciences Building | 901750 | Financially Closed | 6/24/15 | $19,800,000 | $18,877,185 | UCONN 2000; UCH Capital |
| Support Building Addition/Renovation | 5006797 | Cancelled | 12/12/12 | $7,800,000 | UCONN 2000 | |
| Tomotherapy Equipment Installation | 05006842 | Financially Closed | 3/13/07 | $4,300,000 | $3,647,636 | UCH Capital |
| UConn Medical Group – Clinical Space Fit – Out, Storrs Center | 13-003 | Financially Closed | 6/26/13 | $4,365,000 | $4,125,549 | UCH Capital |